What to prepare for a final inspection and how to record questions on the works, the site and the handover documents.
Fasades.lv · A practical guide for building owners and property managers
Restored red-and-white façade with a decorative window surround.
Gather the latest agreed scope, approved changes and unresolved items. Agree who will attend and how to record the results. A visual inspection is one part of the handover. Required checks and records depend on the project.
Bring the latest agreed work schedule or specification. Identify agreed changes and proposals still awaiting approval so that everyone assesses the same scope.
Start at one elevation and move around the building in order. Use consistent location labels. For questions about an opening, sill or finish transition, include both a general view and a close-up. Record broad façade areas as well as mouldings and decorative details.
Give each item a number and location. State who will respond or complete any agreed action, and how it will be checked. Distinguish an observation from a question and an agreed repair. Check formal acceptance requirements with the responsible specialists.
Keep one current record of the results. Agree who verifies the agreed actions. Assemble the documents the building owner needs to retain so the next property manager can find them.