A timber subframe is one way to support a ventilated façade. In this drawing the cladding panels are screwed to timber battens with protective EPDM tape on the front. Specify the subframe layers, continuous ventilation path and fixings together.

Ventilējamās fasādes mezgls uz koka apakškonstrukcijas ar EPDM aizsarglenti un skrūvētu apdari

Battens are installed in separate layers

The drawing shows horizontal and vertical battens crossing in separate layers. The outer vertical battens take the cladding fixings, and horizontal members sit behind them. Placing all battens in the same plane changes how the detail works.

Select the batten directions to suit the cladding and airflow. Where horizontal battens interrupt vertical airflow, provide the designed additional layer or an alternative detail. Check that ventilation runs continuously from the bottom to the top.

What EPDM tape does

EPDM joint protection tape goes between the cladding and the front of the timber batten. It is particularly important at open joints and works alongside the façade’s drainage and ventilation details.

Choose the tape width, type and application according to the system instructions and batten position. The tape must cover the intended contact area.

How to choose timber and screws

Battens must meet the specified load capacity, dimensions and exposure requirements. At panel joints provide room for the fixings from both panels and the specified edge distances. Use the required timber section for the project.

Use the cladding manufacturer’s specified fasteners, such as compatible stainless-steel façade screws. Screw head, material and application matter. Torx T20 describes the drive profile, and the screw still needs to meet the cladding specification.

How to organise installation

Check the substrate and set out the batten centrelines. Fit the designed layers, align the front plane and finish insulation and wind-barrier junctions. Then fit the EPDM tape and prepare the cladding fixings.

Drill, screw and form joints in line with the selected system. Check the subframe-to-wall and panel-to-batten connections individually, each against its intended load and substrate.

What to establish before choosing the system

Assess building height, loads, condition, moisture exposure and the project’s fire requirements. Detail reveals, the base and the top. Compare costs including all battens, fixings, protective tape and levelling labour.